1 (844) 613-7410
ContractorsPrepSchool@Gmail.com
1741 N. State Rd. 7 Margate, FL. 33063

STATE UNDERGROUND EXAM

STATE UNDERGOUND:

°EXAM PREPARATION

Our professional staff members are all educated and licensed in their field of expertise. Our Staff has been in the construction exam preparation services for over twenty-five years. Our exam preparation options are listed below:

EXAM DESCRIPTION

SCOPE OF LICENSE

The Underground Utility Contractors Exam is given in two parts.
Part 1 – Business and Finance
Part 2 – Trade Knowledge

Part 1 of the Exam is 6½ hours and is now administered as a computer based test.
This exam is usually available on a daily basis.

Part 2 of the Exam is 5 hours and is now administered as a computer based test.

UNDERGROUND UTILITY & EXCAVATION CONTRACTOR
A contractor whose services are limited to the construction, installation, and repair, on public or private property, whether accomplished through open excavations or through other means, including, but not limited to, directional drilling, auger boring, jacking and boring, trenches technologies, wet and dry taps, grouting, and slip lining, of main sanitary sewer collection systems, main water distribution systems, storm sewer collection systems, and the continuation of utility lines from the main systems to a point of termination up to and including the meter location for the individual occupancy, sewer collection systems at property line on residential or single-occupancy commercial properties, or on multi occupancy properties at manhole or wye lateral extended to an invert elevation as engineered to accommodate future building sewers, water distribution systems, or storm sewer collection systems at storm sewer structures. However, an underground utility and excavation contractor may install empty underground conduits in rights-of-way, easements, platted rights-of-way in new site development, and sleeves for parking lot crossings no smaller than 2 inches in diameter, provided that each conduit system installed is designed by a licensed professional engineer or an authorized employee of a municipality, county, or public utility and that the installation of any such conduit does not include installation of any conductor wiring or connection to an energized electrical system. An underground utility and excavation contractor shall not install any piping that is an integral part of a fire protection system beginning at the point where the piping is used exclusively for such system.

STATE UNDERGOUND COURSES

COMPLETE GOLD PACKAGE

$795.00

Includes: Business & Technical:

Instructional CD’s & DVD’s
EZ Contractors Tab’s
Home Study Program
2 Hours Of One on One With Instructor
Via Phone Or Webcam.

HOMESTUDY

BUSINESS GOLD PACKAGE

$495.00

Includes: Business Only:

Instructional CD’s & DVD’s
EZ Contractors Tab’s
Home Study Program
2 Hours Of One on One With Instructor
Via Phone Or Webcam.

HOMESTUDY

TECHNICAL GOLD PACKAGE

$495.00

Includes: Technical Only:

Instructional CD’s & DVD’s
EZ Contractors Tab’s
Home Study Program
2 Hours Of One on One With Instructor
Via Phone Or Webcam.

HOMESTUDY